Construction
-
-
Garage project before siding.
-
-
Little sun room that leaked up near Lakewood. Tear off the roof, replace with new, and finish the inside with vertical 3″ siding. Dark walnut stain and poly.
-
-
Roof torn off to expose water damage.
-
-
Water damaged sunroom put back and completed.
-
-
Sewing room on the chain in Waupaca. Original garage is on far left; construction is building a sewing room. To the left of the sewing room is a place to store a vintage car.
-
-
Built these steps. 17 windows and 3 entry doors.
-
-
Inside of a complete cottage gut and update. This shows laminate flooring throughout, skip trowel walls and ceiling, painted trim and new bathroom.
-
-
Quite a pile to trim out a log cabin!
-
-
Installing pine car siding. Before routing.
-
-
Completed deck in New London.
-
-
Getting started. All decks and railings get 2 coats.
-
-
Railings first
-
-
twin 2 story addition featuring a master bedroom upper and living room lower